Enertech Global
53
EAV - EME/EMD Rev. A Models
Installation and Operations Manual
WV Installation: Heat & Cool-with Hot Water
OPTIONAL
NON-PRESSURIZED
FLOW CENTER
TO
LOOP
FIELD
FROM
LOOP
FIELD
SOURCE IN
SOURCE OUT
P/T
P/T
P/T
P/T
SOURCE IN
SOURCE OUT
TO
LOOP
FIELD
FROM
LOOP
FIELD
FLUSH
VALVE
Typ
e XX
XX X
X-X
X X
XX
XXX
V ~
XX/XX
Hz
GFXX
X
EuP Ready
I1/1
(A)
P1(W)
X.XX
X.XX
XX
XX
Max.
Min
.
P/N:
XXX
XXXX
PC:X
XXX
XX
IP
XX
TF
XX
Max.
X.X
MPa
A
High
Effici
enc
y
XX
EEI<0.23
HYDRAULIC
SEPARATOR
RADIANT
FLOOR
HEATING
ZONE 2
RADIANT
FLOOR
HEATING
ZONE 3
HYDRONIC
AIR HANDLER
ZONE 1
DHW OUT
ΔP
LOAD OUT
TURBOMAX
WATER HEATER
DOMESTIC
COLD
WATER
HOT
COLD
LOAD
IN
LOAD
OUT
MAKE-UP
WATER
SYSTEM
PUMP
LOAD IN
DHW IN
“OFF” TO
FLUSH PORT
“OFF” TO
FLUSH PORT
OPEN
OPEN
OPEN
OPEN
OPEN
SET TO
PRESSURE
NEEDED FOR
SYSTEM
OPERATING
POSITION
OPERATING
POSITION
OPERATING
POSITION
OPEN
“OFF” TO
FLUSH PORT
“OFF” TO
FLUSH PORT
OPEN
OPEN
CLOSED
OPEN
OPEN
TO/FROM
BOILER IF
APPLICABLE
OPEN
CLOSED
Figure 13l: Final Position of Valves
Section 6: Unit Piping Installation
Piping Diagram - Final Position of Valves