GS-IOB-120/240VAC Installation lnstructions
Once the main bracket has been removed, install the circuit breakers and
mechanical bypass according to the following steps.
1. Place each circuit breaker behind the bracket and orient it so that the
pole with the switch is on top and the numbers read correctly. Center
the device so that the raised area protrudes through the bracket.
2. Place the red bypass brackets over the screw holes for the top three
circuit breaker poles. Face the brackets inward as shown in Figure 4.
3. While placing the red brackets, insert the red bypass plate between
them. The tabs on the plate should
fit
into the slots on the brackets.
NOTE: The plate must be oriented so the hole is on the right. Both
circuit breakers covered by the plate must be in the OFF position.
4. When the circuit breakers and bypass mechanism is in place, insert
screws through the holes in the main bracket. Use the 6-32 x 3/8"
screws to secure the breakers with red brackets. Use the screws
previously removed from the circuit breakers to reattach those not
covered by the red brackets.
5. Tighten until secure, but do not over-tighten.
1 1
Tabs
"
Bypass plate
Brackets
facing
;owa,d
� Sloa
Bypass
assembly
Figure 4 lnstalling Mechanical Bypass
Hole
Once installed, the plate will not allow both circuit breakers to be in the ON
position. The plate can slide to allow one device to be turned on. The upper
circuit breaker allows the inverter's output to deliver power normally to the loads.
The lower one causes the AC source to bypass the inverter directly to the loads.
900-0126-01-00 REV A