GS-IOB-120/240VAC Installation lnstructions
Table 1
Parts List
ltem
Quantity
AC Circuit Breakers, Double-Pole (50 A, 120/240 Vac)
4
with 6-32 x ¼" screws installed
Label Set
1
Installation lnstructions
1
Hardware Kit:
►
Bus Bars
6
►
Bus Bar lnsulators, Red
6
►
Bus Bar lnsulators, Black
6
►
Mechanical Bypass Plate, Red
1
►
2
Mechanical Bypass Brackets, Red
►
Self-Tapping Screws, 10-32 x ½"
13 (1 extra)
►
Machine Screws, 6-32 x 3/8"
4
Conductors:
►
Wires, Labeled, Red and Black
12
►
Wire, Labeled, White
1
►
Wires, Short, Dual Ring Terminal, Red
2
►
Wires, Short, Dual Ring Terminal, Black
2
►
Wire,Green
1
lnstalling the Bus Bars
The GS-IOB-120/240VAC has enough parts to install up to six AC bus bars in an
enclosure. (The neutral and ground bars are already installed.) To install a
bus bar in the GSLC:
1.
Select one bus bar and two insulators of the
same color (either red or black). Fit one
insulator onto each end of the bus bar.
2.
Insert one self-tapping 10-32 x ½"
screws through the hole on each
insulator. Seat these screws in the
GSLC chassis and screw them in.
These screws require a large amount
of torque to start.
3.
Apply the correct label from the label
set to the chassis near each bus bar
for identification purposes. Figure 2
shows the standard locations for
these bus bars. Figure 5 on page 7
shows the intended label positions.
[E1
900-0126-01-00 REV A
Figure 2 Bus Bar Positions
IMPORTANT:
lf the bus bars are placed in other locations or if the labels or
electrical use of the bus bars differ from the figure, the wires
included in this kit may not be of sufficient length.
3
Summary of Contents for OutBack POWER ALPHA OUTBACK ENERGY GS-IOB-120/240VAC
Page 6: ......