Purpose 

This document provides information on how to install the Input/Output/Bypass 

Assembly needed for a 120/240 Vac configuration using an Outßack GSLC 

(GS Load Center) enclosure. 

This product allows manual switching between a single Radian Series 

lnverter/Charger and an AC source, facilitating maintenance and power 

continuity. lt is intended to be installed within the GSLC or one of its variants. 

Scope 

This document covers how to install the input, output, and bypass circuit 

breakers and mechanical interlock onto the GSLC. 

Wiring requirements are 

site-specific and 

will 

vary by installation. 

Certain steps may be omitted or 

alte red if they do not apply to a particular installation. 

These instructions are for use by qualified personnel who meet all local and 

governmental code requirements for licensing and training for the installation of 
electrical power systems with AC and DC voltage up to 600 volts. 

Requirements 

Outßack Power's GS-IOB-120/240VAC is intended as a component for Outßack 

listed UL508A or UL 1741 lndustrial Control Panels, specifically the GSLC variants. 

lt is intended for indoor use only. This equipment is to be installed by qualified 

personnel only.  Refer to the 

GS Load Center Installation Manual 

for complete 

installation instructions. 

Grounding lnstructions 

The enclosure for the GS-IOB-120/240VAC should be connected to a grounded, 

permanent wiring system. The AC and DC circuits are not bonded to the 

enclosure chassis.  System grounding, when required by the National Electric 

Code, ANSI/NFPA 70 or the Canadian Electrical Code, CSA C22.1, is the 

responsibility of the installer.  All installations should comply with all national and 

local codes and ordinances. 
The equipment ground is marked with this symbol: 

900-0126-01-00 REV A 

Summary of Contents for OutBack POWER ALPHA OUTBACK ENERGY GS-IOB-120/240VAC

Page 1: ...use by qualified personnel who meet all local and governmental code requirements for licensing and training for the installation of electrical power systems with AC and DC voltage up to 600 volts Req...

Page 2: ...120 240VAC Installation lnstructions Tools Required Philips Screwdriver Fiat Screwdriver Socket Set Digital multimeter DMM or ohmmeter Components Figure 1 GS IOB 120 240VAC Components 2 900 0126 01 00...

Page 3: ...sure The neutral and ground bars are already installed To install a bus bar in the GSLC 1 Select one bus bar and two insulators of the same color either red or black Fit one insulator onto each end of...

Page 4: ...sometimes called the dead front of the GSLC Remove the six screws installed across the top and bottom of the cover see Figure 3 and take the interior cover off 3 Remove the main circuit breaker bracke...

Page 5: ...so the hole is on the right Both circuit breakers covered by the plate must be in the OFF position 4 When the circuit breakers and bypass mechanism is inplace insert screws through the holes in the m...

Page 6: ......

Page 7: ...ij f1 1 1 1 1 1 1 1 i ii i i 1 1 Figure 5 Basic AC Wiring At this stage the installation is complete The interior cover must be re installed using the six screws and star washers previously removed Th...

Page 8: ...ER S RISK Notice of Copyright GS IOB 120 240VAC Installation lnstructions February 2014 by Out ack Power Technologies All Rights Reserved Trademarks Out ack Power is a registered trademark of Out ack...

Reviews: