ASSEMBLY AND USER MANUAL
SOLAR BLOCK ULTRA
6
2.3.
Installer’s Liability
The installer is liable for proper equipment installation and for putting into operation. The installer
must bear in mind the following notes:
•
Read and closely follow the instructions of the manuals supplied with the appliance;
•
Carry out installation in accordance with standards in force and required by the manufacturer;
•
Carry out the initial start-up of the equipment and verify all the checkpoints;
•
Explain the installation to the user as well as how he/she should use the equipment;
•
Notify the user of its obligation, where required, as regards equipment maintenance and
inspection operations;
•
Obligation to provide the user with all the documentation supplied with the equipment
(manuals and warranty certificate).
2.4.
Safety Information
With a view to protecting the physical integrity of the operator as well as of the equipment, it is vital
that all the safety information noted in this manual should be taken into account.
This appliance is not envisaged for use by people (including children) whose physical, sensorial or
mental capabilities are reduced or by people without any experience or knowledge, unless they have
been given supervision or instructions about use of the appliance by someone responsible for its safety.
Children must be supervised to ensure that they do not play with the appliance.
3.
INDICATIONS
This manual accompanies all the “Thermodynamic Solar Block HT 12
-
32” equipment and
contains
important instructions which must be followed during installation.
3.1.
Unit inspection
The unit was tested and inspected for quality assurance before its dispatch. Carefully inspect the
equipment components (Solar Block, Solar Panels etc.) as soon as you receive it in order to check that
all the equipment is intact.
Confirm whether all the parts requested have been received in accordance with that which has been
specified and whether the type, size and voltage of the unit are correct.
3.2.
Lodging a complaint
If damage is identified in the inspection carried out at the time of reception of the unit, describe the
damage in the transport reception document. Any transport complaint must be submitted at the act
of delivery.
If you are in any doubt, get in touch with ENERGIE to obtain information about how to lodge a
complaint with the haulage company.
Should damage occur during transport, do not install the unit. Keep all packaging for
inspection of the hauler.