5
www.enelx.com
Phone: +1-844-584-2329
Site survey:
The JuicePump can be installed onto a
newly prepared concrete pad, or onto an
existing concrete surface, with service
wiring supplied through conduit via the
foundation or above ground.
A qualified engineer must
survey the installation site to determine
the correct ground preparation for the
size and weight of the JuicePump, in
accordance with all local applicable codes
and regulations.
If a foundation to supply power from
underground is to be prepared, follow the
underground power instruction for
installation.
If the charger is to be installed onto an
existing concrete surface, follow the
above ground power instruction for
installation.
The JuicePump is best installed following
the recommended site configuration
requirements.
Ground fixing:
The JuicePump is to be fixed to the
ground through the baseplate fixing holes
with 4 x M16 or 5/8-11 inch fasteners
(not supplied). The fasteners should
fix the Veefil securely to the foundation
through the baseplate and protrude
30-40mm/1.2-1.6 inch maximum from
the foundation surface, in accordance
with the dimensions and fixing points
shown in: Figure 5: Fixing guide.
See Figure 1: Dimensions walls or
obstacles, for installation against or near
walls or other obstacles.
Foundation requirements:
The foundation must be flat, even, and
the appropriate density for the weight of
the JuicePump.
Check the flatness and level of the
foundation and level of the JuicePump
baseplate prior to fixing.
Communications:
4G network capability or Ethernet.
The JuicePump is fitted with a Harting
external IP65 rated ethernet port. This
port can be accessed temporarily during
installation. If a more permanent, sealed
connection is required, use Harting
external ethernet connector, 9153000401.
See page 23 for ethernet port access.
Site restriction:
Installation shall not be done in a
commercial garage (repair facility) or
closer than 6 meters/20ft of an outdoor
motor fuel dispensing device.
Site configuration