24
www.enelx.com
Phone: +1-844-584-2329
Once the charger has been commissioned
the unit requires re-assembly and closing
prior to operation.
Follow these steps in order to ready
the unit for operation:
1. Remove lifting straps
Carefully remove the lifting straps from
the top slots in the metalwork.
2. Attach service cover
Place the Service Cover over the switch
gear and ensure it sits flush with the
metalwork panel prior to fastening with
screws with a 2.5mm hex bit. If it
doesn’t sit flush remove and ensure the
wiring is sitting behind the lower face of
the switch gear.
3. Attach service hatch over
service cover
Check the gasket has not been damaged
or soiled. If using a power drill to fasten
the nuts ensure the correct torque setting
of no greater than 2.0 Nm/17.70 lb-in.
If using hand tool, fasten until resistance
felt. Do not over tighten.
4. Re-attach radiator (if required)
•
Angle the radiator and rest on the
baseplate.
•
Re-connect the four way connector.
•
Re-connect cooling hoses by pressing
the metal parts together, and ensure
they are sitting out of the way to avoid
pinching the hose or obstructing the
radiator.
Ensure there is no leakage at this
point.
Closing checklist