Installation
Stamolys CA71CODcr
10
Hauser
6.
Connect the drain hoses to the connections marked for chromate waste, rinse waste and
emergency overflow.
7.
Route the drain hose for dichromate waste into the cover of the canister and make sure the
drain hose for the rinse water and that for emergency overflow end in the drain pipe previously
laid. The drain hose for emergency overflow must be open to air. Avoid siphon formation at all
times!
8.
Insert the valve hoses accordingly. These were partly removed from the valves for
transportation. This prevents the hoses from sticking or pressure being applied to a point in the
hose over an extended period.
9.
Secure the hose boxes in the appropriate pump holders:
Sample/acid pump, left (rear position), reagent pump, right (center position). The direction of
flow of the sample and reagent must be counterclockwise.
10. Connect the sample supply.
For questions regarding sample conditioning and its automation, please contact Service or the
sales center responsible for your region.
11. Connect the tubes from canisters containing reagents andstandards to the following nozzles:
a0012421
Fig. 5:
Valves and valve hoses
1
2
3
4
5
6
7
8
9
10
11
Sample
Standard (100 or 2500 mg/l O
2
)
0 mg/l O
2
standard
Sulfuric acid R1
Dichromate solution R2
From sample/acid pump P1
Inlet to sample/acid pump P1
From reagent pump P2
Inlet, reagent pump P2
Inlet, reagent to reactor
Inlet, sample/acid to reactor
a0012351
Fig. 6:
Pump 1, top view
R1
Reagent 1
a0012676
Fig. 7:
Pump 2, top view
R2
Reagent 2
Canister
Tube designation (mark)
Sample
Reagent 1
Reagent 2
Standard solution
Standard solution 0 mg/l O
2
P
none (PTFE hose)
R2
S
0