TDLAS Gas Analyzer
XA02744C
Hauser
17
Mounting the Analyzer
The SS500, SS2000, and SS3000 analyzers are manufactured for wall or
Unistrut
®
(or equivalent) metal framing installations. Depending on your
application and configuration, the analyzer may come pre-mounted on a SCS
panel to be mounted on a wall or Unistrut framing, or without a panel requir
-
ing mounting via the standard electronics enclosure tabs. Refer to the layout
diagrams in the Operating Instructions or as-built system drawings for
detailed mounting dimension and “Lifting/carrying the analyzer” below for
recommendations for safely moving the equipment.
Lifting
Points
Lifting
Points
Figure 3–2 Lifting and carrying the SS3000 TDLAS Gas Analyzers
When mounting the analyzer, be sure to position the
instrument so that it is not difficult to operate adjacent
devices.
It is critical to mount the analyzer so that the inlet and outlet
lines reach the inlet and outlet connections on the chassis
while still maintaining flexibility so that the sample lines are
not under excessive stress.
Bolts or screws used for wall-mounting must be able to
support four times the weight of the instrument. For weight
specifications
.