SS2100 TDLAS Gas Analyzer
XA02750C
Hauser
13
6.
Fully ream all tubing ends. Blow out the line for 10 to 15 seconds with
clean, dry nitrogen or air prior to making the connection.
7.
Connect the sample supply tube to the SCS using the 1/4 in. stainless
steel compression-type fitting provided.
8.
Tighten all new fittings 1-1/4 turns with a wrench from finger tight.
For connections with previously swaged ferrules, thread the nut to the
previously pulled up position, then tighten slightly with a wrench.
Secure tubing to appropriate structural supports as required.
9.
Check all connections for gas leaks. Using a liquid leak detector is rec
-
ommended.
Ventilation
Requirements
There are no special requirements for ventilation of the analyzer. For infor
-
mation related to mitigating risks associated with process gases, etc → 7.
Do not exceed 10 PSIG (0.7 barg) in sample cell. Damage to
cell may result.