4.4 Commissioning
Before switching the measuring equipment on for the first time repeat the following
checks:
•
Check the electrical connections and the allocation of the terminals.
•
Compare the data on the nameplate with the local mains voltage and frequency.
•
Does the direction of the arrow on the nameplate (sensor) agree with the actual
direction of flow in the piping?
If the results of these checks are satisfactory, switch on the supply voltage.
The unit is ready for operation.
4. Operation and Commissioning
Promag 31
38
Hauser
Summary of Contents for promag 31
Page 4: ...Promag 31 4 Endress Hauser ...
Page 22: ...2 Mounting and Installation Promag 31 22 Endress Hauser ...
Page 28: ...Promag 31 28 Endress Hauser ...
Page 44: ...5 Fault Location and Remedies Promag 31 44 Endress Hauser ...
Page 56: ...6 Technical Data Promag 31 56 Endress Hauser ...
Page 59: ......