Micropilot M FMR250 FOUNDATION Fieldbus
Commissioning
Hauser
69
6.7
Commissioning with the Field Communicator 375, 475
The steps of the commissioning procedure are the same as with a FOUNDATION Fieldbus
configuration tool (
→
ä
64).
The blocks should be parametrized in the following order:
• The RESOURCE BLOCK
• The SENSOR BLOCK (the "basic setup" method can be used for this,
→
ä
42)
• The ANALOG INPUT BLOCKS