Master Meter System
Safety instructions
Hauser
9
2
Safety instructions
2.1
Requirements for the personnel
The personnel for installation, commissioning, diagnostics and maintenance must fulfill
the following requirements:
‣
Trained, qualified specialists must have a relevant qualification for this specific function
and task.
‣
Are authorized by the plant owner/operator.
‣
Are familiar with federal/national regulations.
‣
Before starting work, read and understand the instructions in the manual and
supplementary documentation as well as the certificates (depending on the
application).
‣
Follow instructions and comply with basic conditions.
The operating personnel must fulfill the following requirements:
‣
Are instructed and authorized according to the requirements of the task by the facility's
owner-operator.
‣
Follow the instructions in this manual.
2.2
Intended use
This user manual is intended for
operators
working with the HMI of the Master Meter
System. The functionality described in this manual applies to users with the
Operator
authorization level.
The HMI of the Master Meter System was designed for use with Proline Promass F/Q/X
300/500 Coriolis flowmeters as master meter. Any other use is regarded as improper use.
The manufacture is not responsible for any damage caused by improper use. In such cases,
the user bears full responsibility.
Intended use includes compliance with the operating and maintenance requirements
specified by the manufacturer.
Depending on the version ordered, the measuring device can also measure potentially
explosive, flammable, poisonous and oxidizing media.
Measuring devices for use in hazardous areas, in hygienic applications or where there is an
increased risk due to process pressure, are labeled accordingly on the nameplate.
To ensure that the measuring device remains in proper condition for the operation time:
‣
Observe the specified temperature range.
‣
Only use the system in full compliance with the data on the nameplate and the general
conditions listed in the Operating Instructions and supplementary documentation.
‣
Check the nameplate to verify if the system ordered is permitted for the intended use in
the area for which it is approved (e.g. explosion protection).
‣
Ensure that the system is permanently protected against corrosion caused by
environmental influences.
2.3
Workplace safety
When working on and with the system:
‣
Wear the required personal protective equipment as per national regulations.
When mounting the cabinet:
‣
Due to the increased risk of cuts, wear suitable gloves and protective goggles.
For welding work on the piping:
‣
Do not ground the welding unit via the system.
Summary of Contents for Master Meter System
Page 26: ...Operation Master Meter System 26 Endress Hauser A0048050 A0048052 ...
Page 58: ......
Page 59: ......