Master Meter System
Operation
Hauser
25
8.6.4
"Summary" screen
Once the settings have been confirmed, tap
Next Step
. The "Summary" screen opens. The
system now provides the operator with a summary of the previously selected settings
(→ 25).
If there are red fields present, please wait a few seconds until the new selection has
been synchronized with the MM flow computer and all fields are green.
A0048048
8.6.5
"Prove Run" screen
Once the summary has been confirmed, tap
Next Step
. This is the interface used by the
operator to run the proving operation.
• If
Master Meter Proving Stability
is enabled, check and confirm that the stability status
is "stable". If the stability is "unstable", the
Start Prove
is grayed out and operation is not
permitted.
• Tap the
Start Prove
button on the top left of the screen (→ 26). The system starts
in accordance with the program logic.
• While the process is running, the test phase is shown on the right-hand side of the
screen. The
Prove Result
button in the bottom right corner of the screen is grayed out
until the operation has been completed in accordance with the defined settings
• Expand and display additional information by tapping the
...
button in the bottom right
corner of the screen.
While the process is running, the operator can tap the
Abort Prove
button at any
time to cancel the operation. In this case, the system stops at the point it is currently
at, and the system status changes to "Warning".
Summary of Contents for Master Meter System
Page 26: ...Operation Master Meter System 26 Endress Hauser A0048050 A0048052 ...
Page 58: ......
Page 59: ......