Electrical connection
Liquiline System CA80FE
32
Hauser
Cable sample (does not necessarily correspond to the original cable supplied)
1
2
3
A0044089
16
Terminated cable
1
Outer shield (exposed)
2
Cable cores with ferrules
3
Cable sheath (insulation)
SP1
N
L
PE
86
85
97
98
5
4
A0044090
17
Inserting the cable
4
Cable clamp for hose heating
5
Shielding clamp for
Memosens supply and power
supply
SP1
N
L
PE
86
85
97
98
A0044091
18
Tightening the screw
(2 Nm)
1. Disconnect the mains plug.
2. To fold out the carrier board towards the front, proceed as described in the "Routing the
cables" section .
3. Release a suitable hose gland on the right-hand underside of the analyzer and remove
the dummy plug from the gland.
4. Guide the spiral hose through the hose gland.
5.
Order versions with G and NPT cable glands:
replace the pre-mounted M
‐
thread cable
glands with the G or NPT glands enclosed. This does not affect the M32 hose glands.
6. Comply with the instructions for protective grounding when installing the analyzer.
7. Remove the protective cover in the upper right-hand corner.
A0044866