6 Commissioning
Levelflex M FMP 40 with Foundation Fieldbus
74
EHauser
Basic Setup step 6/6:
•
This step starts the tank mapping
•
The measured distance and the current measured value are always displayed in the
header
•
for a description, see page 65
6.8.1
Blocking distance
!
Note!
At installation in high nozzles, please the blocking distance in the function
"
upper block.dist
"
(059)
newly enter!
measured value
distance