Levelflex M FMP 40 with Foundation Fieldbus
3 Mounting
Hauser
17
3.4.3
Special notes for bulk solids
Installation in concrete silos
Installation, for example, into a thick concrete ceiling should be made flush with the
lower edge. Alternatively, the probe can also be installed into a pipe that must not
protrude over the lower edge of the silo ceiling. Installation suggestions see diagram.
•
In the case of bulk solids, as great a
distance as possible from the filling
curtain is especially important to avoid
wear.
•
In concrete silos, a
large distance
(B)
should be observed between the probe
and the concrete wall, if possible >= 1m,
but at least 0.5m
B
≥
100 mm
≥
100 mm
Ø 80...150 mm
metal
Extension rod /
Centering
(see accessories)