CE 4
Mechanical installation
Hauser
7
3
Mechanical installation
3.1
Delivery, transport, storage
3.1.1
Delivery
•
Is the packaging or content damaged?
•
If damaged, contact the transport company.
3.1.2
Transport to measurement point
The measurement station is delivered mounted on a palette. In order to avoid transport
damage, the station is fixed to the pallet in a number of positions. The palette can be
transported using a fork lift truck or crane (min. loading 500 kg) (see Fig. 2 Pos. A and
B). The built-in pump is separately bolted down on the pallet.
The measurement station must be transported upright and secured to prevent tipping
over. Avoid shocks.
Fig. 2:
Transport to installation point
Pos. A: Lifting the measurement station with a crane. Fitting correct lifting tackle (see arrow).
Pos. B: Lifting the measurement station using a fork lift truck.
3.1.3
Storage
If the system is to be stored for a longer period (>4 weeks) the following must be taken
care to avoid damage to the unit:
•
Completely empty and clean the measurement station. New units are delivered
completely empty
•
pH sensor must be stored in the delivered calibration beaker filled with a pH 7 buffer
solution
•
When using a peristaltic pump, the pump hose must be removed and stored
according to the respective operating instructions (Section 8 in the ring binder)