CE 4
2
Hauser
Short overview
For quick and simple commissioning.
Safety notes
⇒
Chap. 1, Page 4
⇓
Step 1: Install measurement station
⇒
Chap. 3, Page 7
In this chapter the foundation template, installation levels and hose
installation and measurement station installation can be found.
⇓
Step 2: Wire measurement station
⇒
Chap. 4, Page 12
Here hints how to wire and electrical connect the measurement
station can be found.
⇓
Step 3: Operating and set-up of the measurement station
⇒
Chap. 5, Page 13
The operation of individual components can be found in the
respective operating manuals!
⇓
Step 4: Commissioning the measurement station
⇒
Chap. 6, Page 15
Here the mothod for initial and re-commissioning of the
measurement station can be found.
⇓
Step 5: Maintenance and cleaning of the measurement station
⇒
Chap. 7, Page 1
7
Here the procedure for manual and automatic cleaning of the
measurement station can be found.