Maintenance
CCS240/241
26
Hauser
5. For recommissioning, follow the same procedure as for commissioning → 19.
Ensure that no biofouling occurs during longer interruptions to measurement. Remove
continuous organic deposits such as films of bacteria.
Fit protection cap on sensor.
1. To keep the membrane moist after the sensor has been removed, refill the protection
cap with electrolyte or clean water.
A0037528
10
Carefully slide protection cap onto the membrane cap.
2. Top part of protection cap is in the open position.
Carefully slide protection cap onto the membrane cap.
3. Secure protection cap by rotating the top part of the protection cap.
A0037530
11
Securing protection cap by rotating the top part