XA02751C
2-Pack/3-Pack TDLAS Gas Analyzer
14
Hauser
5.
Run stainless steel tubing from the field pressure reducing station to
the sample supply port of the SCS and set for the specified supply pres
-
sure. Refer to the system drawings for the 2-Pack/3-Pack analyzer.
6.
Bend tubing using industrial grade benders, check tubing fit to ensure
proper seating between the tubing and fittings.
7.
Fully ream all tubing ends. Blow out the line for 10
to
15 seconds with
clean, dry nitrogen or air prior to making the connection.
8.
Connect the sample supply tube to the SCS using the 1/4 in. stainless
steel compression-type fitting provided.
9.
Tighten all new fittings 1-1/4 turns with a wrench from finger tight.
For connections with previously swaged ferrules, thread the nut to the
previously pulled up position, then tighten slightly with a wrench.
Secure tubing to appropriate structural supports as required.
10. Check all connections for gas leaks. Hauser recommends
using a liquid leak detector.
Requirements for
Ventilation
There are no special requirements for ventilation of the analyzer. For infor
-
mation related to mitigating risks associated with process gases, etc. → 8.
Do not exceed 10 PSIG (0.7 barg) in sample cell. Damage to
cell may result.
Summary of Contents for 2-Pack TDLAS
Page 35: ......