background image

 

 
 

                                       

 

  

 

                                                                Eccentric Cam 

         ___________________________________

 

 

 
 

Important: Before attempting to remove the cover, switch off mains 

and remove power supply cable from rear of sieve shaker. 

 
 

In order to adjust the gap on the eccentric cam remove the cover as 

follows: 

1. 

Remove the two clamp rods. 

2. 

Remove the four cover screws and the blanking plug. 

3. 

Remove the mains inlet connector by unscrewing the two M3 

countersunk screws securing the inlet connector and draw out 

to clear the cover. 

4. 

Remove the mains switch. 

5. 

The switch is a snap fitting and can be gently levered out, do 

not disconnect leads. 

6. 

Lift up the cover assembly, taking care to ease up the rear to 

clear the electrical components at the control panel over the 

location casting. 

7. 

Disconnect the wiring to the motor and the earth lead. 

8. 

The cover assembly may now be completely removed. 

9. 

To reassemble the shaker, reverse the order of 1 to 8 above. 

 

 

 

 

 

 

 

 

 

 

 

        

 

 

 

 

- 19 -

 

 

 

 

        

 

 

 

 

Summary of Contents for EFL 2000/1

Page 1: ...Sieve Stacking 6 8 Operating Instructions 9 11 Position of Controls 9 Function of Controls 10 11 Mains Inlet 10 Mains Switch 10 Mains Connected Indicator 10 Mains Power Indicator 10 Process Timer 10 1...

Page 2: ..._______________________________________________________ Contents Eccentric Cam 19 Adjustment of Clearance 20 Specification 21 General Advice 22...

Page 3: ...y motor with an eccentric cam drive with special non metallic laminated springs that are set at a calculated angle to provide a horizontal twist as well as a vertical movement to carry out efficient s...

Page 4: ...ly complete with Locking Assemblies 4 off Anti Vibration Mounts 4 off M10 Large Washers 1 off Mains Cable 1 off Instruction Manual EFL 2000 1 2 off Short Clamp Rods SA 564 3 2 off Standard Clamp Rods...

Page 5: ...peration of the sieve shaker placing the shaker on a level surface ensures the even distribution of the sample over the sieves and ensures machine stability Take Care as the shaker weighs 83 Kg CLAMP...

Page 6: ...e location plate and tighten the locknuts Place the two large plain washers over the 20mm threads of the clamp sleeves These can be seen protruding vertically from the two side lugs on the clamp plate...

Page 7: ...a qualified electrician Do Not Connect to any other supply other than that stated on the Nameplate Important This equipment must be connected to mains earth The EFL sieve shaker is provided with a det...

Page 8: ...24 EFL Full 6 12 16 2000 2 Half Not Applicable 24 32 All sieve stacks require the necessary lid and receiver The recesses in the location casting will accept the following sieve diameters EFL 2000 1...

Page 9: ...e down squarely onto the lid at the top of the sieve stack Ensure that the clamping 2 handwheels at the top are loose and the locking assemblies are fully pushed down There should be a 5mm gap between...

Page 10: ...Screw the two clamping handwheels down simultaneously to ensure the clamping plate is square Continue until the handwheels are tight against the internal stop Hand tightness must be exerted so that th...

Page 11: ...controls and indicators before operating the machine This should be done in conjunction with the diagram below CLAMP HAND CLAMP PLATE WHEELS SIDE HANDLE LEVERS SIEVE STACK ROUND CLAMP RODS 4 Power In...

Page 12: ...d power is switched on at the local outlet If the l e d fails to light with the local outlet switch in the On position then a Fuse 6 has blown or power is not present at the mains 4 Mains Power Indica...

Page 13: ...continuously 30 35 40 F 60 6 Fuse This is an anti surge 1 inch ceramic fuse which protects the electrical components within the equipment It is important that the recommended current rating is not exc...

Page 14: ...ipment will immediately start and automatically switch off upon completion of the set time NOTE The shaker can be stopped at any time by turning the Process Timer knob anti clockwise to 0 Unscrew the...

Page 15: ...ded that the mains power supply is via a residual current device on a miniature circuit breaker Power Breaker If there is any doubt with respect to the use of this equipment contact a qualified electr...

Page 16: ...suitable length of hose fitted to drain into a convenient drainage point The O ring seals are fitted on the outside of the bottom rim of each sieve so that when the sieves are stacked onto each other...

Page 17: ...entical type and rating as the original The rating of the fuse is marked on a label above the fuse Switch off the mains supply at the switch at the rear of the shaker and remove the mains cable Unscre...

Page 18: ...ide of the location casting Removal 1 Remove the shaker cover Refer to section entitled Eccentric Cam 2 Loosen the locknut on the nylon headed bolt 3 Screw nylon headed bolt fully into location castin...

Page 19: ...t and tighten to torque of 0 66 Kgfm 6 5Nm 3 Place 4 hexagon headed bolts in the motor flange with threads protruding outwards Ensure that there is a spring washer under each head 4 Locate the motor o...

Page 20: ...retaining bolts finger tightness Ensure that there is both a flat and a spring washer under each head 2 Unscrew the nylon headed bolt to just above the eccentric cam bearing surface 3 Ensure that the...

Page 21: ...inlet connector by unscrewing the two M3 countersunk screws securing the inlet connector and draw out to clear the cover 4 Remove the mains switch 5 The switch is a snap fitting and can be gently lev...

Page 22: ...ylon headed bolt 3 Adjust the nylon headed bolt to give a gap between the face of the nylon headed bolt and the outside of the bearing of 0 64mm 0 025 in using a feeler gauge See diagrams below 4 Tigh...

Page 23: ...lass 1 earthed 1 earthed Vibrations Speed 1 425 per minute at 50 Hz 1 130 per minute at 60 Hz Process Time 0 to 60 minutes Dimensions EFL 2000 1 EFL 2000 2 850mm High 850mm High including rods includi...

Page 24: ...d should never need changing The sieve shaker has been constructed and factory tested to ensure correct operation when connected to the specified electricity supply indicated on the machines rating pl...

Page 25: ...Endecotts Limited Lombard Road London SW19 3TZ England Tel 44 0 20 8542 8121 Fax 44 0 20 8543 6629 E mail sales endecotts com web site http www endecotts com...