EM TEST (Switzerland) GmbH
CWS500 N1.3 / N1.4
User manual
V 1.01
29 / 47
6.3.
Calibration and Test setup Overview
A calibration starts at 100 kHz the first calibration and increases the next frequency 1% of the previous value.
The calibration ends at approx. 240 MHz.
6.3.1. CDN
Calibration setup acc. IEC 61000-4-6 Ed. 3
Fig 6.4 :
Tolerances for calibration: Umr = (Uo/6) +/- 25 % or Uo
– 15,6 dB +/- 2 dB
Measuring for calibration:
Umr (Monitor input voltage)
Recorded signal:
Generator RF level
Test setup acc. IEC 61000-4-6 Ed 3
Fig 6.5 :