background image

27136-0-0110

Page 13

4.  Insert blower assembly into interior, bottom of firebox. Posi

-

tion blower assembly so that you align the notch on back of 

blower assembly with the center screw on firebox back, then 

push the blower assembly against firebox back. The blower 

wheel must be centered with the back wall of the firebox. The 

magnets on the back and bottom of blower assembly will suf-

ficiently hold blower assembly in place.

Note: 

For field installation of blower assembly, it may be easier to 

remove rear cover panel to install blower. This eliminates 

the need to remove brick liner panels, but the blower would 

have  to  be  installed  prior  to  installing  the  firebox  into  a 

wall or chase. 

See figure 25.

5.  once the blower assembly is in position, locate the plug but-

ton in the top right rear corner of the firebox. Remove the 

plug with a standard screwdriver and discard plug.

6.  Next, find the fan control switch and wire assembly. Feed the 

wires through the hole at the top of the firebox, and secure the 

fan control switch with (2) #6 screws provided. 

See figure 

26.

7.  The fan control wires will slide down between the firebox 

and outer wrap near the blower assembly. 

See figure 26

.

8.  one fan control wire will have a 1/4” female terminal that 

must be attached to the open terminal on the blower motor. 

See figure 29, connection A.

9.  The other fan control wire has a 1/4” male terminal. attach 

this terminal to the open terminal on the blower power cord. 

See figure 29, connection b

10.  Route the wires away from moving parts of the blower as-

sembly and retain wires together near the blower motor using 

the plastic purse clip provided.

11.  To  complete  the  installation,  plug  the  power  cord  into  the 

junction box receptacle at the right rear corner of the firebox 

outer wrap. 

See figure 27.

12.  if room permits, the power cord can be located from the out-

side of the unit looking through the junction box access hole 

(with the junction box removed), then plug up the power cord 

before reinstalling the pre-wired junction box.

13.  once all connections are made electrically, it is recommend-

ed that you test the blower fan control operation by turning 

on power to the blower (caution: 110 Volt). Then apply heat 

to the fan control switch inside the firebox with a lighter or 

match  until  blower  is  activated.  once  blower  is  activated, 

check for proper operation. Do not place hands near blower 

assembly or other wiring while power is on.

14.  Replace blower access plate and/or reinstall the brick liner 

panels if provided.

15.  This completes the installation of the optional FBB5 Blower 

kit accessory.

Note: 

This blower is equipped with a heat activated fan control 

switch. Blower will operate when the firebox warms up, 

and  will  turn  off  automatically  when  the  firebox  cools 

down.

REAR COVER PANEL MAY BE

REMOVED TO INSTALL BLOWER

REINSTALL COVER AFTER

BLOWER IS INSTALLED

figure 25

FAN CONTROL

SWITCH LOCATION

FAN CONTROL WIRES

figure 26

figure 27

BLOWER POWER CORD

Summary of Contents for VFP36FB0F-3

Page 1: ...instructions supplied with the decora tive type unvented room heater for the minimum fireplace size requirement DO NOT INSTALL a vent free log set IN THIS FIREBOX UNLESS THIS FIREBOX MEETS THE MINIMUM...

Page 2: ...Gas Line Connection 8 Optional Fresh Air Kit Installation Instructions 9 11 Optional Single Speed Blower Installations Instructions 12 14 Junction Box Wiring Installation Instructions 15 Maintenance...

Page 3: ...such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is operating I...

Page 4: ...Grate Clearance The minimum clearance between the front legs of the grate and front edge of the firebox is 2 Leave at least 36 clearance from the front of the firebox CLEARANCES 45 6 3 MAX PERPENDICUL...

Page 5: ...g tile or other combustible material other than wood flooring it should be installed on a metal or wood panel extending the full width and depth of the unit At this point you should have decided what...

Page 6: ...6 Figure 6 Firebox Dimensions J K H I A G F B E C D L M FIREBOX INSTALLATION INSTRUCTIONS continued VFP36 A 41 1 8 B 39 1 2 C 21 7 16 D 32 1 4 E 38 1 2 F 36 G 27 13 16 H 6 1 8 I 34 J 8 3 8 K 5 5 8 L...

Page 7: ...installed before the firebox is used Failure to do so may create a possible fire hazard The hood is located inside the firebox If brass stainless steel or hammered pewter hoods are desired they can be...

Page 8: ...for all LP fireboxes to reduce the supply tank pressure to a maximum of 14 w c This is in addition to the regulator fitted to the log set WARNING CONNECTION DIRECTLY TO AN UNREGULATED L P TANK CAN CAU...

Page 9: ...uce outside air to the fireplace or firebox as desired It must be installed prior to or at the time of fireplace or firebox installation to framing The FreshAir kit must be installed prior to the inst...

Page 10: ...LY OUTER CASING FRESH AIR ROD OUTSIDE AIR ROD BRACKET Figure 18 OUTSIDE AIR ROD BRACKET OPEN FRESH AIR ROD CONTROL LEVER LEFT SIDE VIEW OF FIREBOX OPENING TOP CUTAWAY VIEW DAMPER ASSEMBLY OUTER CASING...

Page 11: ...clamps or screws 3 Run the other end of the duct through the exterior wall cut out 4 From the outside of the building connect the duct to the collar on the outside air vent assembly with band clamp or...

Page 12: ...activate pow er to the Firebox and control the operation of the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified electrician See Figure 23 1 If instal...

Page 13: ...minal Attach this terminal to the open terminal on the blower power cord See Figure 29 Connection B 10 Route the wires away from moving parts of the blower as sembly and retain wires together near the...

Page 14: ...a dirty blower wheel Remove fan and clean blower wheels Warning Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control k...

Page 15: ...box Install a ULlisted cable clamp not supplied in the knockout hole Leave approximately 6 of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to...

Page 16: ...PART NO DESCRIPTION 1 17247 TOP STANDOFF 2 10554 FRAMING BRACKET 3 17162 JUNCTION BOX ASSEMBLY 4 R3492 RECEPTACLE 5 R3491 COVER JUNCTION BOX 6 20145 HOOD 7 R7052 ROD SCREEN 8 R8201 SCREEN CURTAIN 9 R8...

Page 17: ...27136 0 0110 Page 17 PARTS VIEW 2 3 4 5 6 7 8 1 10 9 2 2 2...

Page 18: ...Variable Speed Control Kit Wall mounted variable speed control for use with FBB5 blower SCV 1 Fresh Air Kit 1 2 8 4 7 6 5 3 Deluxe and Premium Fireboxes BVA 1 Frame Kits Extruded Aluminum Frame Kits B...

Page 19: ...ered Pew ter and Stainless Steel finishes Contact dealer for all available optional hood accessories Decorative Door Kits Available as optional kits in Black Brass Hammered Pew ter and Stainless Steel...

Page 20: ...eater Hearth and Grills Victor Division of F W Webb Company 200 Locust Street Hartford CT 06114 Phone 860 722 2433 Toll Free 800 243 9360 Fax 860 293 0479 Toll Free Fax 800 274 2004 Websites www fwweb...

Page 21: ...27136 0 0110 Page 21 SERVICE NOTES...

Page 22: ...27136 0 0110 Page 22 SERVICE NOTES...

Page 23: ...27136 0 0110 Page 23 SERVICE NOTES...

Page 24: ...s Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 If you have a general question about our products please e mail us at info empirecomfort com If you have a service or repair question...

Reviews: