background image

ZC Kit – Large Pellet Insert

(99200149)

Page 1 of 8

10/9/06

© Travis Industries, Inc.

Compatibility

 

Astoria Bay Pellet Insert

 

Yankee Bay Pellet Insert

Packing List

 

ZC Can Rear Panel

 

ZC Can Top/Side Panel

 

ZC Can Rear Vent Shield

 

(26) # 8 x 3/8” Type A Screws

Overview

This kit allows an installer to build the above pellet heaters into the framing of a home.

Installation Overview

The minimum framing dimensions and clearances listed in this instruction sheet must be maintained.

Failure to follow all of the instructions in this instruction sheet, and in the manual, will void the listing and

warranty of the pellet heater, and may create a serious fire hazard.

This kit is approved for use in a mobile home.

1

Determine the vent configuration (see “Vent Requirements” and “Vent Termination Requirements”)

2

Prepare the enclosure (see “Minimum Enclosure Dimensions”).

3

Install the floor protection and hearth (see “Minimum Floor Protection”).

If venting to the rear (most common)

Place the 90° onto the insert starter collar and measure the height of the center of the vent.  This will

determine the center height of the wall thimble installed behind the insert in the wall.  NOTE: The vent is

located 7.5” left of center of the appliance.  Install the thimble into the wall, making sure the 3” clearance to

combustibles is met (refer the directions included with the thimble for additional details).  Remove the starter

collar from the pellet heater and install it onto the elbow (seal with silicone).  Determine the correct length for

the horizontal section of vent (the center of the starter collar is 11.25” behind the enclosure opening) and

attach it to the elbow (seal with silicone).  Place this flue section aside until after the zc can is installed.  Then

insert the flue section through the can and thimble.  Once the insert is in place, attach the starter section to

the insert (it is attached with a latch – make sure the gasket is correctly positioned). Attach the additional vent

components to finalize the vent installation (termination, elbow, etc.).

If venting upwards

When installing with vertical vent, the area above the insert must be accessible after the zc can and insert

have been installed (note: the vent is located 11.25” behind the enclosure opening, 7.5” left of center).

Remove the starter collar from the pellet heater and install it onto the vent (seal with silicone).  Insert this vent

through the zc can and attach the starter section to the insert (it is attached with a latch – make sure the

gasket is correctly positioned). Attach the additional vent components to finalize the vent installation

(additional vent lengths, elbows, terminations, etc.).

3

Construct and Install the ZC Can (see “ZC Can Construction and Placement”)

4

Prepare the insert in place it into the ZC Can (see “Insert Preparation and Placement”)

Summary of Contents for 99200149

Page 1: ...s is met refer the directions included with the thimble for additional details Remove the starter collar from the pellet heater and install it onto the elbow seal with silicone Determine the correct length for the horizontal section of vent the center of the starter collar is 11 25 behind the enclosure opening and attach it to the elbow seal with silicone Place this flue section aside until after ...

Page 2: ...ough ceilings make sure to maintain 3 clearance to any combustibles No more than 180 of elbows two 90 elbows one 90 and two 45 elbows etc Pellet vent connections must be sealed airtight with 500 F RTV silicone and screwed together with at least three sheet metal screws Seal each vent section including adapters elbows etc by injecting a liberal amount of 500 F RTV silicone into the gap between sect...

Page 3: ...terminations require 24 H G A D F NOTE Measure clearances to the nearest edge of the exhaust hood A E B C F X A Minimum 4 clearance below or beside any door or window that opens B Minimum 1 clearance above any door or window that opens C Minimum 2 clearance from any adjacent building D Minimum 7 clearance above any grade when adjacent to public walkways NOTE Vent may not terminate in covered walkw...

Page 4: ...rround panels are 32 tall When determining depth include the facing material drywall tile etc see the illustration below When venting vertically there is no maximum depth Width Depth Height When determining the position of the insert consider the position of the framing behind the insert relative to the vent see the illustration below When determining the depth include the facing material drywall ...

Page 5: ...ill need to raise the insert and enclosure height the equivalent amount The leveling bolts may be used on the insert for adjustments AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA 45 Min width of surround panels 18 Min Floor Protection AA AA AA AA AAAA...

Page 6: ... top vent applications A A A A Use the included screws to secure the zc can sides and top to the zc can rear panel Rear Vent Shield not required for top vent applications A A A AAA AAA AAA AAA A A A A knock out is provided on the rear panel for rear vent applications Bend the mounting flange as shown AA AA AA AA A A AA AA A A AA AA A AAAAAAA AAAAAAA AAAAAAA Bend the top stand off as shown and secu...

Page 7: ...AAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAA...

Page 8: ...d the use of the Insert Wiring Kit when installing this kit SKU 97200315 This kit allows for the power cord to be hard wired behind the walls eliminating the need for a visible power cord A AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAAAA AA AA AA Wall Thimble note 3 clearance between vent and combustibles 12 Minimum A A A A A A A A A A A A AAAAAAAAAAAAAAA A A A A A A A A A A A Enclosure He...

Reviews: