6. EXTERNAL UNIT INSTALLATION
Aluminised tape
Refrigeration piping
3
Indoor unit condensation drain
4
Electrical connection cable
between the units
Fig. C
- Provide to use a protection sheet for the cables exposed to the outside.
- It is recommended to set the cables with a drip-proof run in order to
avoid possible infiltrations of water in the outdoor unit.
- Combine the electrical connection cable of the two units to the refrigera-
tion piping and wrap with reinforced tape, possibly alluminized (Fig. C).
- If the cable cannot be solid with the piping, make a suitable wall ancho-
rage by means of a cable fastener or hose clips..
6.4.4 Connection to the outdoor unit terminal board
- Remove the two fixing screws and take off the terminal board cover as
shown in fig. D, E, F.
- Connect the cable to the terminal block as shown Fig. G
Fig. D
- Loosen the screws and insert the ends of the cable completely into the
terminal block, after this tighten the screws.
All'unità esterna
Unità interna
70 mm
10 mm
10 mm
50 mm
Fig. G
- Pull the cable lightly to make sure that the cables have been insert and
fixed rightly.
- After cables connection never forget to tight them to the cable gland.
Fig. E
Single Hi-Wall
Dual Hi-Wall
Trial Hi-Wall
6. EXTERNAL UNIT INSTALLATION
Fig. F
Summary of Contents for XECO Series
Page 28: ...28 GB GB 10 XECO 1213 XECO 1813 and XECO 2413 10 WIRING DIAGRAMS...
Page 29: ...29 10 WIRING DIAGRAMS XECO 1813D XECO 2413T GB GB...
Page 34: ......
Page 37: ...37 Note...
Page 38: ...Note...
Page 39: ...Note...