10
GB
GB
4. HANDLING AND TRANSPORT
5. UNITS POSITIONING
To move the units please use the relevant pre-cut handles placed on the
short sides of the packaging and comply with the current laws concerning
safety on the working place of the installation.
The external unit and the internal units of big size have to be moved by
two persons.
Pre-cut handles
Pre-cut handles
Package of the internal unit
External unit package
Pre-cut handles
Pre-cut handles
Unpacking operations have to be done carefully because the external
part of the units has not to be damaged when knifes or cutters are used
to open the carton package.
After unpacking make sure of the unit integrity.
If in doubt, do not use the unit and refer to the authorized technical
personnel
Attention!
Please verify that the two units of the air conditioner do not have been
damaged during the transport
When a complaint is necessary, please get in touch with the carrier to
make immediately sure about the damage and relevant responsibilities
Before throwing away the packages, make sure that all accessories
supplied have been removed from them.
Summary of Contents for XECO Series
Page 28: ...28 GB GB 10 XECO 1213 XECO 1813 and XECO 2413 10 WIRING DIAGRAMS...
Page 29: ...29 10 WIRING DIAGRAMS XECO 1813D XECO 2413T GB GB...
Page 34: ......
Page 37: ...37 Note...
Page 38: ...Note...
Page 39: ...Note...