Reference Manual
00809-0100-4856 Rev AE
February 2020
Rosemount 356
A-11
POST ASSEMBLY
TESTS
1. Perform a continuity check to ensure the positive and negative
wires have been installed in the correct positions.
2. Check Insulation Resistance for 10 seconds at 500 Vdc. IR for
each of the following configurations must be greater than 1
GOhm:
a. Negative pin to connector housing
b. Positive pin to connector housing
c. Negative pin to positive pin
3. After installation, a continuity check between the connector
housing and cable shield at junction box/electrical panel is
recommended.