Figure 5-23: Step 7
8. Install downstream cone, largest diameter end first, on to shaft and slide along shaft
to rotor.
Figure 5-24: Step 8
9. Insert angled edge of hanger blades into the three slots in hanger hub.
a) When correctly installed, outside edges of hanger blades are parallel to
hanger hub and upstream and downstream edges are perpendicular to
hanger hub.
Disassembly and assembly instructions
Installation and maintenance instructions
October 2019
3-9008-011
50
Daniel “PT” Liquid Turbine Meters
Summary of Contents for Daniel PT
Page 2: ...2 ...