3. Position hanger blades in hanger hub slots to protrude enough from the flat faced
end of the hanger hub to allow the outside edges of hanger blades to fit inside
meter housing bore.
Figure 5-19: Step 3
a) Slide assembly, flat faced end first into upstream bore of meter housing.
b) Push hanger blades so downstream edges are touching deflector ring
upstream edge on rimmed rotor meters or touching upstream edge of step
in bore on rimless rotor meters.
c) Push hanger hub forcing hanger blades outward contacting meter housing
bore.
d) Tap upstream edges of hanger blades with a soft headed hammer making
sure they are properly positioned.
e) Then strike the upstream end of hanger hub wedging and locking assembly
in place.
4. Insert shaft into center hole of upstream end of upstream hanger hub.
Figure 5-20: Step 4
5. Put upstream cone, small diameter end first, on downstream end of shaft, slide into
meter, contacting the downstream end of upstream hanger blades.
Disassembly and assembly instructions
Installation and maintenance instructions
October 2019
3-9008-011
48
Daniel “PT” Liquid Turbine Meters
Summary of Contents for Daniel PT
Page 2: ...2 ...