23
Service Instructions
MAN-02-08-77-0714-EN Rev. 2
September 2020
Section 4: Set-up/Start-up Procedure
Set-up/Start-up Procedure
Section 4: Set-up/Start-up Procedure
In addition to this set-up/start-up procedure, the following documentation will be
necessary to fulfill all set-up and start-up requirements.
1.
General Arrangement drawing
2.
Bill of Material
3.
Schematic drawing
4.
Wiring Diagram drawing
When using these instructions, refer to the schematic diagram, wiring diagram,general
arrangement drawings for the Bettis SMART EHO and the certified bills of material.
Numbers in
[ ]
correspond to components labeled on the wiring diagram.
Numbers in
( )
correspond to components labeled on the schematic diagram.
Information in
(( ))
is descriptive.
When the Bettis SMART EHO is delivered to the job site, it has been both pressure
and function tested. The oil reservoir was filled to operation level when it shipped
from factory.
4.1 Preparation
4.1.1 Safety First
Hydraulic Pressure
!
WARNING
Ensure that test personnel and witnesses are properly informed of the hazards involved
with high pressures and the proper safety barriers are employed.
Never check for leakage using your fingers or hands. Fluid under high pressure can inject
into the skin and cause severe damage or death. Always use an implement such as a piece
of paper.
Safety Equipment
!
WARNING
All personnel in the testing area must always wear safety glasses.