Locating and erecting the cabinets
IM6C75AA P0914426 Standard 3.00 March 2001
There is only one appropriate method to lift a Helios Candeo frame by its top
and it is described in the following procedure and illustrated in Figure 3.2. This
method also applies when lifting the frame out of its shipping crate.
CAUTION
Protect the AC box against damages when lifting the frame.
If provided, the optional AC box used for the AC feeds of the
rectifiers is shipped separately. If, for any reason, this AC box
has been installed prior to lifting the frame by its top, remove it
to prevent damages to it during lifting.
Procedure 3.5 – Lifting and locating a Helios Candeo frame at its final location
Step Action
1
Install a shackle in each factory-installed eyebolt at the top of the frame,
ensuring that the factory-installed stiffening bar is also present.
2
Install a lifting sling of appropriate weight capacity and length as shown in
Figure 3.2.
Note:
It is important that the length be appropriate to maintain an angle of
more than 45°.
3
Use a hoist of appropriate weight capacity to lift the frame up and of the floor.
4
If the hoist is of the mobile type, use it to carry the frame to its final location.
If the hoist is of the fixed type, lower the frame on a dolly or forklift to carry
the frame to its final location. Then, the same hoisting method described in
steps 1 to 3 shall be used to lift the frame off the dolly or forklift and lower it
to its final location on the floor.
5
Use the same procedure for any other frame, if applicable.
–end–