Locating and erecting the cabinets
IM6C75AA P0914426 Standard 3.00 March 2001
In non-earthquake areas, it may be permitted to locate the frame(s) on the floor
without floor anchoring. In earthquake areas, it may be necessary to pour a new
slab of concrete over the existing floor and to anchor the frame(s) into that new
slab.
At all times, it should be the Customer’s responsibility to provide the methods
and/or building modifications required for such applications.
3.2. Locating the frame(s)
Use the floor plans and the specifications to determine where the AP6C75AA
Helios Candeo power system frame(s) will be located.
Note 1:
There shall be a spacing of at least 6” (15 cm) between the back of
the Helios Candeo frame(s) and a wall or any other obstruction, this for
proper ventilation purposes.
Note 2:
There shall be a spacing of at least 30” (75 cm) between the front of
the Helios Candeo frame(s) and a wall or any other equipment or obstruction,
this for safe and proper circulation of maintenance personnel.
Note 3:
As mentioned in the previous Chapter, the AP6C75AA Helios
Candeo power system frames are shipped as pre-assembled and pre-tested
power frames, including the System Manager, the rectifiers, the Battery
Connection Module and the Distribution Module(s). Since it is required to
remove the rectifiers from the frame(s) in order to perform the AC input
cabling for the rectifiers per section 4.3.2 of Chapter 4, it is suggested to
remove all the rectifiers from the frame(s) now as this will lighten the frame
and thus ease the installation effort. Store the rectifiers in a safe location, and
do not reinstall these until told to do so in the appropriate section of this
manual.
3.2.1. Marking the floor
Use the template supplied with each Helios Candeo frame to mark the floor for
the anchor positions of the frame(s). Proceed as described in Procedure 3.1 and
as illustrated in Figure 3.1.
Procedure 3.1 – Marking the floor for the anchor positions
Step Action
1
Use the floor plan to locate the template in the exact final position of the frame.
2
Use a marker pen to mark the floor for the anchor hole positions.
3
Repeat steps 1 and 2 for any other frame, if applicable.
–end–
Summary of Contents for ASTEC Helios Candeo AP6C75AA
Page 2: ......
Page 4: ......
Page 12: ...12 Contents IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Page 95: ......