Preparation
19
Helios Candeo Power System
– AP6C75AA Installation Manual
WARNING
Protecting personnel against electrical shocks.
The power plant cabling shall be performed by qualified
personnel in conformance with local and national electrical
codes.
Input voltages to the rectifiers are at a dangerous level. Ensure
that the circuit breakers are locked in the OFF position at the
AC service panel before attempting to work on the power
plant. Dangerous voltages may still be present at the terminals
even if the rectifiers are OFF. Use a voltmeter to verify for the
presence of such voltages. Do not switch circuit breakers to
ON until the entire system has been assembled and that you
have been instructed to do so in the appropriate procedure.
Improper wiring can cause personal injury and equipment
damage. Verify for proper polarity of the battery leads before
connecting them to the power plant by clearly identifying the
positive and the negative leads.
CAUTION
Safety and equipment protection
Power equipment is heavy (pre-assembled frames, batteries,
etc.). Use a dolly truck, forklift, or hoist whenever possible for
handling and moving the equipment. If a forklift is used, do not
remove the shipping crates before the equipment has been
moved near its final installation location. If a dolly truck is used,
the shipping packages may be removed at the point of
reception. When handling frames with equipment mounted on
them, care must be exercised to ensure that they do not tip
over, as some of these are top heavy.
CAUTION
Protecting the equipment against damages when lifting
If a Helios Candeo frame needs to be lifted by its top for
moving or locating purposes, the appropriate hardware and
method described in the next Chapter
must
be used in order to
insure that no damages are caused to the top of the frame.
Summary of Contents for ASTEC Helios Candeo AP6C75AA
Page 2: ......
Page 4: ......
Page 12: ...12 Contents IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Page 95: ......