Locating and erecting the cabinets
23
Helios Candeo Power System
– AP6C75AA Installation Manual
Figure 3.1 – Floor anchor marking pattern
23.63”
15.0”
1.43”
2.00”
19.58”
12.15”
Preferred location for
the anchors
Non-preferred location for
the anchors
Front
16.15”
3.3. Floor
anchoring
Note:
Floor anchoring requirements may be different where the equipment is
earthquake braced. Specific requirements for such applications shall be either
covered in the job specifications or provided by the Customer.
3.3.1. Drilling the floor
3.3.1.1. Concrete floor
For applications where concrete floor anchoring is used, drill the floor as
described in the following procedure.
CAUTION
Preserving the integrity of earthquake installations
If the application is earthquake but regular anchors were
provided in the specifications, do not use the latter since the
installation will not meet earthquake requirements. Approved
earthquake type anchors shall be ordered to complete the
installation as required to meet earthquake requirements.
However, if the application is non-earthquake but earthquake
anchors were provided in the specifications, the latter can be
used if standard anchors are not readily available, in order to
avoid time loss while waiting for standard anchors. The
earthquake anchors will only provide a stronger and better
support.