Locating and erecting the cabinets
27
Helios Candeo Power System
– AP6C75AA Installation Manual
Figure 3.2 – Appropriate method of lifting a Helios Candeo frame by its top
Shackle
Direction
of pull
Do not use at 45° or less
Top of frame
Shackle
Never use the sling
without shackles as this
may break the eyebolts
Typical sling
arrangement
Stiffening bar:
DO NOT
REMOVE
PRIOR TO
LIFTING
3.5. Securing the frame(s) in place
3.5.1. Standard anchoring in a concrete floor
Secure the frame(s) to a concrete floor using standard anchors as described in
the following procedure (refer to Figure 3.3).
Procedure 3.6 – Securing the frame(s) to a concrete floor using standard anchors
(non-earthquake applications)
Step Action
1
If applicable, install the floor isolation pad where the frame is to be installed.
2
Lower the frame to its exact final position over the anchoring holes (and the
isolation pad if applicable).
3
Install the anchoring stud in each anchoring hole.
4
Install the anchoring hardware for each anchor; follow the stack-up order
shown in Figure 3.3.
5
Level the frame for proper horizontal and vertical leveling as required using
incompressible shims.
6
Tighten each anchor applying a torque of 25 ft-lb (34 N-m).
7
Repeat steps 1 to 6 for any other frame, if applicable.
–end–