28
Locating and erecting the cabinets
IM6C75AA P0914426 Standard 3.00 March 2001
Figure 3.3 – Assembly stack-up for standard concrete anchors
Threaded rod
Hex nut
Isolating bushing
Flat washer
Split ring washer
Flat washer
3/8" (10 mm)
drop in anchor
Concrete
floor
Frame base
Isolation pad
(optional)
3.5.2. Wood floor
Secure the frame(s) to a wood floor as described in the following procedure
Procedure 3.7 – Securing the frame(s) to a wood floor
Step Action
1
Lower the frame in its exact final position, over the anchoring holes drilled per
Procedure 3.3.
2
Install the anchoring hardware for each anchor position; follow the stack-up
order shown in Figure 3.4.
3
Level the frame for proper horizontal and vertical levelling as required as
required using incompressible shims.
4
Tighten each lag screw as required.
5
Repeat steps 1 to 4 for any other frame, if applicable.
–end–
Figure 3.4 – Assembly stack-up for wood floor anchors
Lag screw
Washer
Washer