
12
Hydraulic connections
Suction Hose.
Tightening Nut
Holding ring
Hose holder
O-ring
Valve
The hydraulic components to be installed for the pumps to work properly are:
Suction Hose with a level probe and bottom filter x 2
Delivery Hose with injection valve
Discharge hose x 3
Suction Hose.
Unscrew the suction ring nut completely on the pump body and draw the components required to assemble the hose:
tightening ring nut, Holding ring and hose holder.
Assemble as shown, making sure that the hose is fully inserted on the hose holder.
Tighten the hose on the pump body by tightening the ring nut with your hands.
Connect the other end of the hose to the bottom filter using the same procedure.
Delivery Hose.
Unscrew the suction ring nut completely on the pump body and draw the components required to assemble the hose:
tightening ring nut, Holding ring and hose holder.
Assemble as shown, making sure that the hose is fully inserted on the hose holder.
Tighten the hose on the pump body by tightening the ring nut with your hands.
Connect the other end of the hose to the injection valve using the same procedure.
Figure A
Summary of Contents for LOTUS AIR 10
Page 40: ...40 Logical working scheme...
Page 42: ...42...