11
Install - Step 1 continued
Install the storage-system hardware
Install the storage-system hardware in a rack or cabinet
If your storage-system hardware is already installed in a rack or cabinet, skip to
"Connect the storage-system back-end ports" (page 21).
For detailed instructions on installing your storage system hardware, refer to the
EMC Rails and Enclosures CX4 Series Field Installation Guide
(300-007-436) located on
the Powerlink website.
WARNING
!
The equipment is heavy and should be installed into a rack by two
people. To avoid personal injury and/or damage to the equipment, do
not attempt to lift and install the unit into a rack without a
mechanical lift and/or help from another person
.
1. Install the standby power supply (SPS) first, at the lowest available space in the
cabinet.
The SPS is a
required system component
of all AC systems that allows write caching and
prevents data loss in case of a power failure.
a. Adjust the mounting tray rails to the distance between the
inside edges
of your
front and back NEMA channels.
Adjusting the mounting rails
Adj
us
tment
s
crew
s
Adj
us
tment
s
crew
s
Adj
us
tment
s
crew
s
Adj
us
tment
s
crew
s
S
P
S
a
dj
us
t
ab
le r
a
il
s
EMC
3
460