background image

11 

Elterm M.M.Kaszuba Sp.J., ul. Przemyslowa 5, 86-200 Chelmno 

 

 

   Boiler’s type, serial number, production date 

Date of sales 

   Legible stamp of a retail outlet and signature 

 

 

 

Unless the above stamps are present the guarantee is invalid 

 

GUARANTEE 

1.

 

Guarantee for trouble-free operation is valid for a period of 24 months (12 months for 

AsMB

). 

2.

 

Guarantee expires if any alterations are made to the product without the manufacturer’s consent, or if assembly or use are 

not in accordance with the enclosed operation manual and terms and conditions of guarantee. 

3.

 

Guarantee repairs are made by the manufacturer or persons/companies authorized by the same.  

4.

 

If filled out incompletely, the guarantee is invalid. 

5.

 

If the serviceperson discovers machine failure resulting from the user’s fault (e.g. improperly made wiring system, air-locked 

central heating system, use or assembly that is not in compliance with the user manual etc.), or in the event the guarantee is 

invalid, the costs of repair and travelling are borne by the claimant.  

6.

 

Failure on the part  of the user to follow the  serviceperson’s recommendations provided in the  guarantee repair  protocol 

results in the guarantee being suspended until such recommendations are implemented. 

 

Do not call servicemen without becoming fully familiarized with the boiler user manual, as well as conditions of guarantee 

and assembly

Before you call service, read the section 

„TROUBLESHOOTING

 

 

Stamp of serviceman, short description of repair and recommendations for the user

 

 

 

 

Following guarantee repair by the serviceman, one of the below guarantee coupons to be cut off, filled out and handed to the serviceman 

Guarantee coupon I 

 

…………………………….…………………………………………………………………………………………………………………………… 

Full name and address of the boiler owner  

 
 

…………………………….…………………………………………………………………………………………………………………………… 

Postal code, town /Boiler owner tel. no.  

 
 

…………………………….…………………………………………              ………………………………………………………… 

                                                                              

Production date                Boiler serial no.

 

Guarantee coupon II 

 

…………………………….…………………………………………………………………………………………………………… 

Full name and address of the boiler owner  

 
 

…………………………….…………………………………………………………………………………………………………………………… 

Postal code, town /Boiler owner tel. no.  

 
 

…………………………….…………………………………………              ………………………………………………………… 

          

Production date                Boiler serial no

 

 

Summary of Contents for redline asbill

Page 1: ...ntral heating systems Electric heating boiler SilverLine series RedLine series AsP Wachmistrz Venus Venere AsBN Rotmistrz Earth Terra AsZN Major Mars Marte AsD Brygadier Jupiter Giove AsBI Działon Saturn Saturno AsMB Mobilny Mobile Mobil AsHZ Husarz Comet Cometa AsBIII Batalion Star Stella Please see video prior installation ...

Page 2: ... BOILERS for more detailed pictures please see www elterm pl Dimensions and components of AsBN boiler Dimensions and components of AsP boiler Dimensions and components of AsD boiler Dimensions and components of AsZN boiler Dimensions and components of AsBI boiler Dimensions and components of AsMB boiler ...

Page 3: ...g systems safety unit expansion vessel and circulation pump is included AsD boiler in closed central heating system this model is designed for autonomous operation in both open and closed central heating systems safety unit expansion vessel and circulation pumps are included Additional water tank with coil at least 12kW is needed for proper boiler operation 1 External metal cast 2 Mounting plate 3...

Page 4: ...ase power supply 400V 3N 50Hz Models with 4 6 9 12 and 15kW powers are also available without any processing in 1 phase version 230V 1N 50Hz greater powers can also be prepared in 1 phase version upon request Boiler s power supply is connected to terminal strip labeled as L1L2L3N PE wire needs to be connected to screw on mounting plate Technical data table below provides information on the cross s...

Page 5: ...e 1 x 80 3 x 10 0 180 250 15 kW 100 67 33 by 1 6 3 phases 3 x 25 5 x 4 0 180 250 18 kW 100 67 33 by 1 6 3 phases 3 x 32 5 x 6 0 220 310 21 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 6 0 260 360 24 kW 100 67 33 by 1 6 3 phases 3 x 40 5 x 10 0 300 400 27 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 220 380 30 kW 100 67 33 by 1 6 3 phases 3 x 50 5 x 16 0 240 400 33 kW 100 67 33 by 1 6 3 phases 3 x 50 5 ...

Page 6: ...llation if it isn t please turn the boiler off and on again to repeat activity 4 For AsD model only LED display shows number 50 it represents current HUW temperature set on boiler bottom line visible on display Increase required temperature decrease required temperature confirm required temperature go to CH temperature setting 5 LED display shows number 20 it represents current CH temperature set ...

Page 7: ...y decrease temperature confirm setting 70 is recommended go to P05 function P05 Maximum boiler operating temperature HUW AsD model only Shows set operating temperature increase temperature up to 65 C decrease temperature down to 5 C confirm setting 50 is recommended go to P06 function P06 Boiler operation hysteresis Shows current hysteresis setting increase value 2 6 C decrease value 5 1 C confirm...

Page 8: ... lower line blinking Do not remove boiler external metal casing once device remains turned on In case boiler is activated by mistake with no water inside wait until heaters cool down fill device with water and switch it on again Under no circumstances fill device with cold water when heaters are still hot Once water in central heating system is heated system should be bled once again special atten...

Page 9: ...ween boiler and room thermostat Room temperature reached already idle time Wait for room temperature drop verification 5 LED display shows one of the below message E01 sensor error short circuit insufficient resistance e g sensor wire damaged E02 sensor error excessive resistance sensor not connected wire broken terminals not tightened properly on terminal strip Temperature not measured damaged se...

Page 10: ...requirements concerning Ecodesign for energy related products Attachment 13 EU Commission regulation nr 622 2012 With regard to Ecodesign requirements for glandless standalone circulators and glandless circulators integrated in products and that the standards hereinafter referred to have been duly applied and observed The harmonized standards applicable to the product to which this declaration of ...

Page 11: ...e or assembly that is not in compliance with the user manual etc or in the event the guarantee is invalid the costs of repair and travelling are borne by the claimant 6 Failure on the part of the user to follow the serviceperson s recommendations provided in the guarantee repair protocol results in the guarantee being suspended until such recommendations are implemented Do not call servicemen with...

Page 12: ...12 Elterm M M Kaszuba Sp J ul Przemyslowa 5 86 200 Chelmno Our other products For more information please visit www elterm pl ...

Reviews: