5
Elterm M.M.Kaszuba Sp.J., ul. Przemyslowa 5, 86-200 Chelmno
Terminal A – use to connect voltage free room temperature
controller
Terminal B – use to connect temperature sensor 1 to boiler’s
body – central heating function (CH)
Terminal C - use to connect temperature sensor 2 to hot
water tank equipped with coil – hot utility water (HUW)
LED display, signaling system and control
Boiler
power
Manual power
distribution (%)
Power
modulation
Power supply
230/400V
Safety
fuses (A)
Power cord
(mm²)
Heated area A
(m²)*
Heated area B
(m²)**
4 kW
100 – 67 – 33
by 1/3
1 phase
1 x 20
3 x 2,5
~ 50
~ 70
4 kW
100 – 67 – 33
by 1/3
3 phases
3 x 6
5 x 1,5
~ 50
~ 70
6 kW
100 – 67 – 33
by 1/3
1 phase
1 x 32
3 x 4,0
~ 70
~ 100
6 kW
100 – 67 – 33
by 1/3
3 phases
3 x 10
5 x 2,5
~ 70
~ 100
9 kW
100 – 67 – 33
by 1/3
1 phase
1 x 40
3 x 10,0
~ 110
~ 150
9 kW
100 – 67 – 33
by 1/3
3 phases
3 x 16
5 x 2,5
~ 110
~ 150
12 kW
100 – 67 – 33
by 1/3
1 phase
1 x 63
3 x 10,0
~ 150
~ 210
12 kW
100 – 67 – 33
by 1/3
3 phases
3 x 20
5 x 4,0
~ 150
~ 210
15 kW
100 – 67 – 33
by 1/6
1 phase
1 x 80
3 x 10,0
~ 180
~ 250
15 kW
100 – 67 – 33
by 1/6
3 phases
3 x 25
5 x 4,0
~ 180
~ 250
18 kW
100 – 67 – 33
by 1/6
3 phases
3 x 32
5 x 6,0
~ 220
~ 310
21 kW
100 – 67 – 33
by 1/6
3 phases
3 x 40
5 x 6,0
~ 260
~ 360
24 kW
100 – 67 – 33
by 1/6
3 phases
3 x 40
5 x 10,0
~ 300
~ 400
27 kW
100 – 67 – 33
by 1/6
3 phases
3 x 50
5 x 16,0
~ 220 - 380
30 kW
100 – 67 – 33
by 1/6
3 phases
3 x 50
5 x 16,0
~ 240 - 400
33 kW
100 – 67 – 33
by 1/6
3 phases
3 x 50
5 x 16,0
~ 260 - 450
36 kW
100 – 67 – 33
by 1/6
3 phases
3 x 63
5 x 16,0
~ 280 - 480
39 kW
100 – 67 – 33
by 1/6
3 phases
3 x 80
5 x 25,0
~ 290 - 500
42 kW
100 – 67 – 33
by 1/6
3 phases
3 x 80
5 x 25,0
~ 300 - 520
45 kW
100 – 67 – 33
by 1/6
3 phases
3 x 80
5 x 25,0
~ 320 - 570
48 kW
100 – 67 – 33
by 1/6
3 phases
3 x 80
5 x 25,0
~ 340 - 600
* Heated area A – boiler as main source of heat ** Heated area B – boiler as alternative source of heat
Exact cable cross section must be matched by qualified electrician based on local conditions analysis.
1. LED display
2. CH operation diode (AsD)
3. HUW operation diode (AsD)
4. OK/ON/OFF button
5. LEFT – change button
6. DOWN – decrease value
8. Diode – °C
9. Diode – power distribution
10. Diode – operating time
11. UP – increase value
12. ON green diode
13. RIGHT – change button
14. OFF red diode