75
Boiler Manual
water until clear water runs from the conden-
sate. At this point, the boiler should be ready to
be re-assembled.
a. Inspect gaskets.
b. Re-install the burner assembly
c. Replace and tighten the (6) 10MM nuts to
the burner plate using staggered tighten-
ing sequence. (See detail)
d. Re-connect all wiring connections
e. Inspect the gas valve to assure the O-ring
is in place. Replace the (4) screws on the
aluminum connector on the gas valve.
Turn the gas back on.
(IMPORTANT:
CHECK FOR GAS LEAKS)
g. Turn the Elite Heating Boiler
®
power back
on and create a demand on the boiler.
When boiler is lit, observe condensate
flow from the boiler. Be sure the boiler is
operating properly.
h. Re-connect the condensate piping to the
outside condensate connection.
PART 13: MAINTENANCE
(CONTINUED)
Summary of Contents for EL-110 LP
Page 48: ...47 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 10 1 09 ...
Page 49: ...48 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 1 14 10 ...
Page 83: ...82 LP 172 REV 2 16 06 ...
Page 84: ...83 LP 172 REV 2 16 06 ...
Page 85: ...84 MAINTENANCE NOTES ...
Page 86: ...85 MAINTENANCE NOTES ...
Page 87: ...86 MAINTENANCE NOTES ...
Page 88: ... 2003 2010 Heat Transfer Products Inc www HTproducts com LP 293 REV 01 06 10 ...