37
Boiler Manual
PART 7: GAS PIPING
A. GAS CONNECTION
The gas supply shall have a maximum inlet
pressure of less than 14" w.c. (3.5 kPa), and a
minimum of 3.5" w.c. (.87 kPa). The entire piping
system, gas meter and regulator must be sized
properly to prevent pressure drop greater than
0.5" (.12 kPa) as stated in the National Fuel Gas
Code. This information is listed on the rating
label.
The gas connection on the Elite Heating Boiler
®
is 3/4” for the EL-80/110/150 and 1” for the
EL-220/299/399. It is mandatory that this fitting is
used for connection to a field fabricated drip leg
as shown in the illustration above per the
National Fuel Gas Code. You must ensure that
the entire gas line to the connection at the Elite
Heating Boiler
®
is no smaller than the unit sup-
plied connection. Once all the inspections have
n
WARNING
Failure to follow all precautions in this section
could result in fire, explosion or death!
n
WARNING
It is very important that you are connected to
the type of gas as noted on the rating plate.
“LP” for liquefied petroleum, propane gas or,
“Nat” natural or city gas. You must not do a gas
conversion on this boiler without an approved
gas conversion kit. All gas connections must be
approved by the local gas supplier, or utility in
addition to the governing authority, prior to
turning the gas supply on.
UNION
GAS SUPPLY
MANUAL SHUT OFF
(FIELD SUPPLIED)
DRIP LEG
PIPING SUPPORT
been performed, the piping must be leak tested.
If the leak test requirement is a higher test pres-
sure than the maximum inlet pressure, you must
isolate the Elite Heating Boiler
®
from the gas
line. In order to do this, you must shut the gas
off using factory and field-installed gas cocks.
This will prevent high pressure. Failure to do so
may damage the gas valve. In the event the gas
valve is exposed to a pressure greater than ½
PSI, 14" w.c. (3.5 kPa), the gas valve must be
replaced. Never use an open flame (match,
lighter, etc.) to check gas connections.
B. GAS PIPING
1. Run the gas supply line in accordance with all
applicable codes.
2. Locate and install manual shutoff valves in ac-
cordance with state and local requirements.
3. In Canada, the Manual Shutoff must be
identified by the installing contractor.
4. It is important to support gas piping as the
unit is not designed to structurally support
large amount of weight.
5. Purge all gas lines thoroughly to avoid start
up issues with air in the lines.
6. Sealing compound must be approved for gas
connections. Care must be taken when
applying compound to prevent blockage or
obstruction of gas flow which my effect the
operation of the unit.
Nominal
Iron Pipe Internal
Length of Pipe (Feet)
Size
Diameter
(inches) (inches)
10
20
30
40
50
60
70
3/4
.824
278
190
152
130
115
105
96
BTU'S
1
1.049
520
350
285
245
215
195
180
PER
1 1/4
1.380
1,050
730
590
500
440
400
370
HOUR
1 1/2
1.610
1,600 1,100
890
760
670
610
560
}
x1,000
80
90
100 125
150
175
200
3/4
.824
90
84
79
72
64
59
55
BTU'S
1
1.049
170
160
150
130
120
110
100
PER
1 1/4
1.380
350
320
305
275
250
225
210
HOUR
1 1/2
1.610
530
490
460
410
380
350
320
}
x1,000
Summary of Contents for EL-110 LP
Page 48: ...47 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 10 1 09 ...
Page 49: ...48 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 1 14 10 ...
Page 83: ...82 LP 172 REV 2 16 06 ...
Page 84: ...83 LP 172 REV 2 16 06 ...
Page 85: ...84 MAINTENANCE NOTES ...
Page 86: ...85 MAINTENANCE NOTES ...
Page 87: ...86 MAINTENANCE NOTES ...
Page 88: ... 2003 2010 Heat Transfer Products Inc www HTproducts com LP 293 REV 01 06 10 ...