![Elite EL-110 LP Installation Manual Download Page 27](http://html.mh-extra.com/html/elite/el-110-lp/el-110-lp_installation-manual_2389424027.webp)
26
Boiler Manual
PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL
(CONTINUED)
Table 6-1
**Note: IPEX is an approved
*Note: Cellular Foa
m
Core Pipe
m
ust only
Manufacturer in Canada
b
e used on INTAKE piping.
supplying vent
m
aterial listed to
ULC-S636
Table 6-2
**Note: IPEX is an approved
*Note: Cellular Foa
m
Core Pipe
m
ust only
Manufacturer in Canada
b
e used on INTAKE piping.
supplying vent
m
aterial listed to
ULC-S636
Table 6-3
**Note: IPEX is an approved
Manufacturer in Canada
supplying vent
m
aterial listed to
ULC-S636
Table 6-4
Table 6-5
Table 6-6
ULC- S636**
N/A
PVC-CELLULAR FOAM CORE*
U.L. LISTED
N/A
PVC SCHEDULE 40 / 80
ANSI /ASTM D1785
PVC DWV
ANSI /ASTM D2665
CPVC SCHEDULE 40 / 80
ANSI /ASTM F441
ULC-S636**
ULC- S636**
CEMENT AND PRIMER
MATERIAL
APPROVED PLASTIC INTAKE VENTING MATERIAL
MATERIAL
STANDARDS FOR INSTALLATION IN:
UNITED STATES
CANADA
ULC S636**
PVC SCHEDULE 40 / 80
APPROVED PLASTIC EXHAUST VENTING MATERIAL
STANDARDS FOR INSTALLATION IN:
UNITED STATES
CANADA
MATERIAL
CPVC SCHEDULE 40 / 80
ANSI /ASTM D2665
ANSI /ASTM F441
APPROVED PLASTIC CONDENSATE PIPING MATERIAL
MATERIAL
STANDARDS FOR INSTALLATION IN:
UNITED STATES
CANADA
UNITED STATES
CANADA
ANSI /ASTM D1785
PVC SCHEDULE 40 / 80
ULC S636**
PVC -DWV
STANDARDS FOR INSTALLATION IN:
UNITED STATES
CANADA
APPROVED METALLIC EXHAUST VENTING MATERIAL
PVC
CPVC
MATERIAL
STANDARDS FOR INSTALLATION IN:
ANSI /ASTM D1785
ULC S636**
AL294C
U.L.LISTED
U.L.LISTED
Ce
m
ents and Pri
m
ers
APPROVED PIPE CEMENT AND PRIMER FOR PLASTIC PIPE
IPEX Syste
m
636
ANSI/ASTM D2564
ANSI/ASTM F493
GALVANIZED
U.L. LISTED
U.L. LISTED
MATERIAL
STANDARDS FOR INSTALLATION IN:
UNITED STATES
CANADA
APPROVED METALLIC INTAKE VENTING MATERIAL
"
B
" GAS VENT
U.L. LISTED
U.L. LISTED
Summary of Contents for EL-110 LP
Page 48: ...47 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 10 1 09 ...
Page 49: ...48 Boiler Manual PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 293 J Rev 1 14 10 ...
Page 83: ...82 LP 172 REV 2 16 06 ...
Page 84: ...83 LP 172 REV 2 16 06 ...
Page 85: ...84 MAINTENANCE NOTES ...
Page 86: ...85 MAINTENANCE NOTES ...
Page 87: ...86 MAINTENANCE NOTES ...
Page 88: ... 2003 2010 Heat Transfer Products Inc www HTproducts com LP 293 REV 01 06 10 ...