background image

JA09252018 

www.elitescreens.com 

 

 

Screen Installation

 (Requires two or more people) 

6.  Once the 

Threaded rods (G)

 are secured in the 

Ceiling hanging brackets (D), 

Fig. 7, hang the 

screen

 from 

the 

threaded rods

 one side at a time through the 

mounting hole

 

tabs 

located on the side end of the screen

’s 

case, Fig. 8.  

 
 
 
 
 
 
 
 
 
 
 
 
 

Have assistants hold the screen in position on the 

threaded rods

, then thread a 

nut

 at the bottom of each rod 

to adjust the final height (Fig 9).  Finally tighten the upper nuts to secure screen in place (Fig 10). 
 
 

 
 

 

 
 
 
 
 
 
 
 

 

 

End covers and caps 

7.  Align the 

End cover (F)

 

holes with the screen’s 

end cover bracket

 located on the end of the screen and 

secure it using the M4x10 screws as shown in Fig. 12. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Mounting 
hole tab  

Fig 8 

Fig 7 

Threaded Rod  

Ceiling 
Structure  

Ceiling  

Fig 9 

Fig 10 

Thread the rods 
until they reach 
the top 

End cover bracket 

End cover  

M4x10 screws 

End cover caps 

Fig 12 

Fig 11 

Summary of Contents for Evanesce Tab Tension B CineGrey 5D

Page 1: ...a factor In order for the CineGrey 5D to maintain its projection qualities and optimum performance please refer to the list below for proper maintenance and cleaning Use a dry microfiber cloth to remo...

Page 2: ...unit Do not attempt to disassemble this unit by yourself No one except authorized technicians can open and make repairs to this unit Make sure the power source this unit is connected to has a continu...

Page 3: ...try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna of the device that may be causing the interference Increase the separation between t...

Page 4: ...ength Height 1 18 30 mm Hanging Bracket Installation 3 Mark the ceiling for the ceiling hanging brackets D according to the measurements obtained by measuring the Screen Length 25 mm 0 98 Fig 1 Then m...

Page 5: ...osition on the threaded rods then thread a nut at the bottom of each rod to adjust the final height Fig 9 Finally tighten the upper nuts to secure screen in place Fig 10 End covers and caps 7 Align th...

Page 6: ...or to cool down and use again after 15 minutes 1 Plug the screen s power cord to the screen and the 3 prong side to a power outlet 2 Once the screen has power you ll be able to control it with the con...

Page 7: ...to the diagram below for wiring instructions Contact your projector s manufacturer for proper 5 12 volt trigger cable information The screen should automatically DROP when the projector is turned ON...

Page 8: ...as this will cause them to snap and void your warranty For Additional Service Please Contact Elite Screens Technical Support Email techsupport elitescreens com A RS485 Part Setting 1 Baud rate 2400 2...

Reviews: