background image

The first operation is to connect the two side frames to the end frames to form the outer shape of the 
completed structure. Another pair of willing hands would be useful at this stage. 
 
1. 

Lift the first side frame into its position by the rear end. 

 
2. 

Slot the eaves bar into the small space between the roof and side corner bar so that the gutter 

is outside the end frame and the two flanges that form the angle of the roof and side are inside and 
tight up against the bolt slots of the roof and side corner bar. 

(Key point).

 

 
3. 

The extra bolts that were inserted in the bolt slots during the gable end assembly can now be 

used.   
 
4. 

Line up the elongated holes in the flanges of the eaves with the bolt slots and slide the bolts 

into them. Put a nut on the top bolt and tighten up. 

(Key point).

 

 
5. 

The built in base attaches to the inside of the corner bar. The bolt placed in the corner bar bolt 

slot at gable end assembly will slide down into the slotted hole at the end of the built in base cill.  
Likewise with the angle base leg, this can now be attached to the end built in base cill utilising the 
bolts inserted at frame assembly.  
 
6. 

Do the same at the other three corners  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
7. 

Slide the glazing beading into both sides of the ridge before attaching the ridge to the roof 

corner bars.  Insert the end of the ridge through the small gap in the corner bars at the top, the verti-
cal part of the ridge will be outside,  pointing skywards and the two flanges that form the angle of 
the roof will be inside, tight up against the bolt slots of the roof corner bars. 
 
8. 

Line up the slotted holes at the end of the ridge with the bolt slots in the corner bars. Push the 

two bolts, previously inserted during the gable end assembly into the slots. Put on nut and tighten. 
 
9. 

The roof bars can now be attached to the 

ridge and gutter. Attach them to the ridge first 
by sliding a bolt into the bolt slot of the glazing 
bar and inserting it through the hole in the 
flange of the ridge. Put a nut on and tighten up.  
Do the same with the rest of the roof bars. 

Summary of Contents for WIDE MAXIM

Page 1: ......

Page 2: ......

Page 3: ......

Page 4: ...te taped 2 2 2 2 22 Bottom door panel together and marked 2 2 2 2 23 Middle door panel door 6 6 6 6 24 Door track support 1 1 1 1 25 Door posts 2 handed 2 unhanded 4 4 4 4 26 Side glazing bar 2 4 6 8...

Page 5: ...erable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gloves should be...

Page 6: ...Bag of fittings containing a Nuts and bolts general assembly b Overlap clips for glass c Spring clips for glass d Casement stay e Casement stay nuts and bolts f Four eave plates not in the main bag bu...

Page 7: ...be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the built in base cill to the middle glazing bar by pushing the bolt through the hole in the cill unit and tightening as before...

Page 8: ...SIDE FRAME ASSEMBLY BEWARE OF SHARP EDGES...

Page 9: ...the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the corner bar You must ensure that the middle hole is...

Page 10: ...ave 3 grooves to receive beading Do not use the middle one only the two outer grooves require beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finger tip tighten app...

Page 11: ...s and that the glazing bars are right into the angle cill at the bottom Key point 9 Tighten all nuts 10 Slide two extra bolts into the built in base cill This will be used later to attach the angle ba...

Page 12: ...of the door opening and 1 door end cill 2 Now engage the door end cill with the 2 built in base cills by pushing the angle of the cill under the locator as shown in the diagram At this stage the cill...

Page 13: ...upport by inserting 3 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening 10 Insert 2 extra bolts into each end of the d...

Page 14: ...DOOR END ASSEMBLY...

Page 15: ...el has the edge for the door skids to fit on The lower infill panel locks on to the bottom panel 5 Fix the door together by screwing through the door side pieces into the holes provided in the edge of...

Page 16: ...unhanded one 11 Do not fit the doors to the gable at this stage wait until the structure is fully assembled prior to glazing 12 Having assembled both doors you need to attach a piece of alloy angle t...

Page 17: ...ttom rail uppermost The top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slot in the side and top rails...

Page 18: ...ASSEMBLY OF GREENHOUSE UNIT...

Page 19: ...will slide down into the slotted hole at the end of the built in base cill Likewise with the angle base leg this can now be attached to the end built in base cill utilising the bolts inserted at frame...

Page 20: ...Before sliding the vent into the ridge slide a piece of black tube into the vent hinge socket Slide the vent into posi tion insert a small self tapping screw into the tube approximately way along the...

Page 21: ...bove the gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out the corner di agonally opposite will also be out By carefully pushing and pulling e...

Page 22: ...the door track This attachment will support the weight of the doors when they are in the open position Attach two small angles 1 x 1 to the ends of the top door track these will act as stops when ope...

Page 23: ...ap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key point 4 Offer the top pane of glass to the glazing bars resting it on the two clips of the bottom pane Insert two wire...

Page 24: ...pane You must ensure that you fit glass above and below the louvre The louvre can not sit directly on the bottom aluminium cill Key point Ref Width mm Length mm A 610 610 B 610 457 D 610 210 E 610 30...

Page 25: ...you do not use muntins or spacers if you have multi sheet or small pane tough ened glass See the diagram for the position of the different sizes The glass is clipped onto the frame in the same way as...

Page 26: ...elow the louvre The louvre cannot fit onto the bottom aluminium cill Key point Replace pane 54 with 1 piece 610 x 280 the louvre and then 1 pane 610 x 904mm YOUR GREENHOUSE IS NOW COMPLETE Code Width...

Page 27: ...OPTIONAL EXTRAS Rainwater kits for guttering...

Page 28: ...ELITE 1206...

Reviews: