background image

REAR END ASSEMBLY 

 

From the main bag of fittings you will require the nuts and bolts, two eave plates and one ridge 
plate.  These are packed with the casement stay and are separated from the main bag of fittings. 
 
Components: 
1 alloy built in base cill 
2 glazing bars 
2 diagonal bracing angles 
2 horizontal bracing angle (1 longer than the other) 
2 roof corner bars (marked “R” at the apex) 
2 side corner bars (unmarked) 
Corner bars are in two packs of 4 and are identical for both gables. They are marked “corner bars”. 
 

INSTRUCTIONS 

 
1. 

Lay out the frame as though you were standing on the inside i.e. with the bolt slot uppermost, 

 

roof corners marked “R” at the apex, opposite each other, facing downwards (i.e. “R” on out

 

side). The roof corner bars are mitred at both ends where as side corner bars are mitred at one 

 

end only 

(Key point)

. The bolt slot is on the inside and faces inwards during initial construc-

 

tion.  If you have a painted greenhouse there is no letter “R” on the corner bar. You 

must

    

 

ensure that the “middle” hole is nearer to the eave plate than the ridge plates. 

(Key point).

 

 
2. 

Slide the glazing beading into each glazing bar and corner bar taking care not to stretch the 

 

material. Trim off any surplus level with the ends of the glazing bar. The corner bars have 3 

 

grooves to receive beading. 

Do not 

use the middle one, only the two outer grooves require 

 

beading. 

 
3. 

Slide two bolts into the bolt channel of each corner bar, put a nut 

 

on and finger tip tighten approx 3” from the end of the bar. These 

 

will later be used in the general assembly for fixing the ridge, eave 

 

and cill to the ends. Now secure the Ridge Gusset Plate and Eaves 

 

Gusset Plates by inserting bolts through the ‘plates’ and into the 

 

holes punched in the flange of the corner bar, at the apex and eave.  

 

Do not tighten the nuts and bolts in the gusset plate at this stage, 

 

finger tip tighten is sufficient. 

 

N.B.  

If you have the 4’ option the roof vent slam bar will attach to one 

of the corner bars.  You will need to insert an extra bolt into the bolt slot of the corner bar onto 
which the vent will close. 
 
Attach the built in base cill to the side corner bars by inserting a bolt through the hole in the flange 
of the corner bar and into the slot in the cill.  
 
4. 

Attach the vertical glazing bars to the built in base by inserting a bolt into the bolt channel of 

 

the glazing bars and locating it with the punched holes in the cill. Before securing the nuts 

 

attach the angle diagonal angle ties to the same bolt as illustrated. The top of the diagonal  

 

angle tie now attaches to the pre-fabricated holes near the top of the side corner bar. There are 

 

3 holes near the top of the side corner bar, and you must ensure you use the top bolt hole. 

 

(Key point)

 

Summary of Contents for WIDE MAXIM

Page 1: ......

Page 2: ......

Page 3: ......

Page 4: ...te taped 2 2 2 2 22 Bottom door panel together and marked 2 2 2 2 23 Middle door panel door 6 6 6 6 24 Door track support 1 1 1 1 25 Door posts 2 handed 2 unhanded 4 4 4 4 26 Side glazing bar 2 4 6 8...

Page 5: ...erable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gloves should be...

Page 6: ...Bag of fittings containing a Nuts and bolts general assembly b Overlap clips for glass c Spring clips for glass d Casement stay e Casement stay nuts and bolts f Four eave plates not in the main bag bu...

Page 7: ...be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the built in base cill to the middle glazing bar by pushing the bolt through the hole in the cill unit and tightening as before...

Page 8: ...SIDE FRAME ASSEMBLY BEWARE OF SHARP EDGES...

Page 9: ...the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the corner bar You must ensure that the middle hole is...

Page 10: ...ave 3 grooves to receive beading Do not use the middle one only the two outer grooves require beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finger tip tighten app...

Page 11: ...s and that the glazing bars are right into the angle cill at the bottom Key point 9 Tighten all nuts 10 Slide two extra bolts into the built in base cill This will be used later to attach the angle ba...

Page 12: ...of the door opening and 1 door end cill 2 Now engage the door end cill with the 2 built in base cills by pushing the angle of the cill under the locator as shown in the diagram At this stage the cill...

Page 13: ...upport by inserting 3 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening 10 Insert 2 extra bolts into each end of the d...

Page 14: ...DOOR END ASSEMBLY...

Page 15: ...el has the edge for the door skids to fit on The lower infill panel locks on to the bottom panel 5 Fix the door together by screwing through the door side pieces into the holes provided in the edge of...

Page 16: ...unhanded one 11 Do not fit the doors to the gable at this stage wait until the structure is fully assembled prior to glazing 12 Having assembled both doors you need to attach a piece of alloy angle t...

Page 17: ...ttom rail uppermost The top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slot in the side and top rails...

Page 18: ...ASSEMBLY OF GREENHOUSE UNIT...

Page 19: ...will slide down into the slotted hole at the end of the built in base cill Likewise with the angle base leg this can now be attached to the end built in base cill utilising the bolts inserted at frame...

Page 20: ...Before sliding the vent into the ridge slide a piece of black tube into the vent hinge socket Slide the vent into posi tion insert a small self tapping screw into the tube approximately way along the...

Page 21: ...bove the gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out the corner di agonally opposite will also be out By carefully pushing and pulling e...

Page 22: ...the door track This attachment will support the weight of the doors when they are in the open position Attach two small angles 1 x 1 to the ends of the top door track these will act as stops when ope...

Page 23: ...ap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key point 4 Offer the top pane of glass to the glazing bars resting it on the two clips of the bottom pane Insert two wire...

Page 24: ...pane You must ensure that you fit glass above and below the louvre The louvre can not sit directly on the bottom aluminium cill Key point Ref Width mm Length mm A 610 610 B 610 457 D 610 210 E 610 30...

Page 25: ...you do not use muntins or spacers if you have multi sheet or small pane tough ened glass See the diagram for the position of the different sizes The glass is clipped onto the frame in the same way as...

Page 26: ...elow the louvre The louvre cannot fit onto the bottom aluminium cill Key point Replace pane 54 with 1 piece 610 x 280 the louvre and then 1 pane 610 x 904mm YOUR GREENHOUSE IS NOW COMPLETE Code Width...

Page 27: ...OPTIONAL EXTRAS Rainwater kits for guttering...

Page 28: ...ELITE 1206...

Reviews: