LX2160 Owner's Manual
Revised July 29, 2019
Page 10
800.445.7846 · www.electro-mech.com
ELECTRICAL INSTALLATION
This section of the manual provides information that is important for locating power
receptacles, running cable, planning for conduit, and other steps needed in preparation
for bringing power and data to the shot clock displays. The final hookups for power and
data will happen after the mechanical installation. But it is wise to plan for key pieces of
the electrical installation prior to physically mounting the cabinets.
The standard configuration of this shot clock set includes a power cable attached to the
top of each cabinet. Input and output ports for data are located here as well. At the
factory, it is possible to relocate these connection points to accommodate special
needs. Let your scoreboard sales rep know about any custom requirements BEFORE
we begin building your cabinets.