11-1
TUBING CONNECTIONS
Revision Y05-01
Service Manual - WMZ
11. TUBING
CONNECTIONS
TUBE (Inch)
TORQUE (Nm)
¼”
⅜”
½”
⅝”
¾”
Flare Nuts
11-13
40-45
60-65
70-75
80-85
Valve Cap
13-20
13-20
18-25
18-25
40-50
Service Port Cap
11-13
11-13
11-13
11-13
11-13
1. Valve Protection Cap-end
2. Refrigerant Valve Port (use Allen wrench to open/close)
3. Valve Protection Cap
4. Refrigerant
Valve
5. Service
Port
Cap
6. Flare
Nut
7. Unit Back Side
8. Copper
Tube
When the outdoor unit is installed above the indoor unit an oil trap is required every 5m along the suction
line at the lowest point of the riser. Incase the indoor unit is installed above the outdoor, no trap is
required.
Summary of Contents for Gcz 12
Page 19: ...4 2 OUTLINE DIMENSIONS Revision Y05 01 Service Manual WMZ 4 3 GCZ 7 9 12 4 4 GCZ 17...
Page 20: ...4 3 OUTLINE DIMENSIONS Revision Y05 01 Service Manual WMZ 4 5 GCZ 22...
Page 147: ...15 2 OPTIONAL ACCESSORIES Revision Y05 01 Service Manual WMZ...
Page 148: ...15 3 OPTIONAL ACCESSORIES Revision Y05 01 Service Manual WMZ...
Page 149: ...15 4 OPTIONAL ACCESSORIES Revision Y05 01 Service Manual WMZ...
Page 150: ...15 5 OPTIONAL ACCESSORIES Revision Y05 01 Service Manual WMZ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......