Commissioning
Check water flow
17
q
actual
= (
∆
T
nominal
/
∆
T
measured
) * q
nominal
[m
3
/h]
Water flow data
R601 R602 R603 R604 R605 R606 R607
Nominal flow rate
[m
3
/h] 6.1 8.1 10.2 12.2 16.3 20.4 23.1
∆
T at nominal flow rate
[ºC]
20
∆
p at nominal flow rate
[kPa]
10
18
28
15
27
42
55
Check water flow
The water flow through the boiler can
be checked with two different methods
shown below.
∆
T measurement
Check the temperature difference over
the boiler (
∆
T flow-return) when the
boiler is running on 100% load. The
nominal
∆
T is 20K and must be at least
between 15K and 25K for secure boiler
operation. An indication of the actual
flow rate can be found with the follo-
wing calculation (see table below for
nominal data):
q
actual
=
√
(
∆
p
measured
/
∆
p
nominal
) * q
nominal
[m
3
/h]
∆
p measurement
Check the pressure difference over the
boiler (
∆
p flow-return) when the boiler
pump is running (burner on is not requi-
red). The nominal
∆
p for each boiler
type can be found in the table below,
actual
∆
p must be within:
0.35*
Δ
p
nom
≤
∆
P
≤
1.75*
∆
p
nom
. An
indication of the actual flow rate can be
found with the following calculation (see
table below for nominal data):
Summary of Contents for Bypass R600
Page 2: ......
Page 34: ......
Page 35: ...Betriebsanleitung für die autorisierte Fachkraft R 600 07 2010 DOC3070 12099579 ...
Page 66: ......
Page 98: ......
Page 119: ...21 21 Bedienung Description du display Programmation ...
Page 130: ......
Page 131: ...Istruzioni per l uso solo per il tecnico autorizzato R 600 07 2010 DOC3070 12099579 ...
Page 151: ...21 Guida all uso Descrizione del display Programmazione ...
Page 162: ......
Page 163: ......